More than 150 completed projects and two under construction: for BPDB, the Bangladesh Army, Navy and Coast Guard, two port authorities, the Civil Aviation Authority, and private industry.

Midland East · 150 MW HFO
Midland East · 150 MW HFO
01
150+
Projects completed
02
665 MW
Thermal capacity engaged
03
9.1 MWp
Solar capacity engaged
04
2
Plants under construction
In construction Thermal & grid Solar & storage Captive & defence
Under construction

In construction now.

Two cantonment solar plants for the Bangladesh Army, both on the OPEX model: 5.41 MWp in total, delivering through November 2026 with no client capital outlay.

Savar Cantonment On-Grid Solar
Under construction
3.30 MWp

Savar Cantonment On-Grid Solar

Bangladesh Army · OPEX

Rooftop and ground-mounted solar under the OPEX model, cutting grid dependency and improving energy sustainability across the cantonment. The largest plant in the company’s portfolio.

26 Nov 2025 – 17 Nov 2026

Padma Cantonment On-Grid Solar
Under construction
2.11 MWp

Padma Cantonment On-Grid Solar

Bangladesh Army · OPEX

On-grid solar under the OPEX model, supporting military infrastructure with clean, reliable energy at no capital outlay to the client.

12 Jan 2026 – 22 Nov 2026

Completed · thermal & grid

Generation, at
national scale.

Five representative contracts: 665 MW built, rehabilitated or operated for BPDB and independent producers.

Katakhali & Shantahar Peaking Power Plants
Completed
2 × 50 MW

Katakhali & Shantahar Peaking Power Plants

BPDB · Dongfang Electric

Engineering, commissioning, operation support and maintenance on MAN 18V32/40 engines. Initial Commercial Operation, Provisional and Final Acceptance obtained, followed by a four-year long-term service agreement.

Chittagong Thermal Power Station
Completed
210 MW

Chittagong Thermal Power Station

BPDB · Dongfang Electric

Complete overhaul and rehabilitation, returned to reliable operation in compliance with BPDB requirements.

HFO Power Plant, Ashuganj
Completed
150 MW

HFO Power Plant, Ashuganj

Midland East Power · CRRC Ziyang

EPC completion and commissioning. Warranty period completed and the plant handed over for commercial operation.

Natural Gas Power Plant, Ashuganj
Completed
55 MW

Natural Gas Power Plant, Ashuganj

BPDB · 60 MW ISO

Co-owner and operator of a natural gas-fired plant powered by MWM gas engines.

150 MWInstalled capacity
Completed

Gas Turbine Rehabilitation

BPDB · liquid fuel

Rehabilitation and hot-section refurbishment of a liquid-fuel gas turbine, restoring operational efficiency and reliability.

Completed · solar & battery storage

Rooftop to
off-grid.

Seven renewable-energy contracts for the armed forces, port authorities, clubs and industry, from 30 kWp rooftops to 3.34 MWp cantonment plants.

Bogura Cantonment
Completed
3.34 MWp

Bogura Cantonment

Bangladesh Army · 2.8 MW AC

High-capacity on-grid solar under the OPEX model, contributing to energy cost savings and renewable adoption within the cantonment.

Sep 2025 – Jun 2026

Chittagong Boat Club
Completed
181 kWp

Chittagong Boat Club

181.13 kWp DC / 155 kW AC

Grid-tied rooftop solar supporting sustainable energy use across the club facilities.

Jul – Dec 2025

Payra Port Authority
Completed
142 kWp

Payra Port Authority

On-grid rooftop · Patuakhali

Supply, installation, testing and commissioning across multiple facilities within the port.

Jul – Dec 2024

Cadet College Club Ltd
Completed
40 kW

Cadet College Club Ltd

Grid-tied rooftop · AC

Design and installation to reduce electricity cost and improve energy sustainability.

Dec 2024 – Feb 2025

Panorama Apparel rooftop solar
Completed
30 kWp

Panorama Apparel

30.38 kWp DC / 25 kW AC

Industrial rooftop on-grid solar sized for factory consumption.

Apr – May 2026

Bangladesh Coast Guard, Dubla Char outpost
Completed
Off-grid + BESS

Bangladesh Coast Guard

Hybrid solar + BESS · West Zone

Installation and commissioning of hybrid off-grid solar and battery storage at the Kokilmoni and Dubla Char outposts.

Jan – May 2024

Off-grid solar and LED lighting at a coastal forward base
Completed
Solar + LED

Bangladesh Navy

Solar + LED · BNS Bhasan Char

Repair and replacement of panels, batteries, auto sensors and LED lighting at the forward base.

Jul – Nov 2025

Completed · captive power & specialist systems

Standby power &
defence systems.

Six representative contracts in standby and captive generation, telecom power and defence surveillance systems.

Telecom

Ericsson AB

200 × 40 kVA diesel generators: supply, installation, testing, commissioning and maintenance support across all 200 units.

Telecom

Bangladesh Telecommunications Company Ltd

A 500 kVA diesel system, supplied, installed, tested, commissioned and maintained.

Aviation

Civil Aviation Authority of Bangladesh

Standby diesel power systems for international and selected domestic airports.

Banking

Sonali Bank Ltd

Diesel gensets of various capacities, supplied and maintained across bank facilities.

Defence

Bangladesh Army

Generators of various capacities supplied and installed at military installations across Bangladesh.

Defence

Bangladesh Navy

Under-vehicle surveillance (UVSS), explosive detection, intelligence equipment and UAV systems.

Get in touch

Have a project in mind?

Send the load, the site and the timeline. We'll tell you honestly whether the numbers work.